This project is on theĀ MississippiĀ river had to go thru the dnr , army corp, and the city to get this oked there severe river bank erosion . that had to be dealt with first before i could touch the upper bank. there was 450 thousand pounds of riprap installed on the river . and another 100 thousands pounds of boulders for the boulder walls. i am finishing this up here spring of 2013